Friday, April 26, 2019
Data Center Design Research Paper Example | Topics and Well Written Essays - 2000 words
Data Center Design - Research Paper ExampleBefore figure the seam cooled system, the amount of heat produced must(prenominal) be quantified. This is either in calories, joules, Tons or BTU. To finalise the heat output of the system, the total quantity of heat produced by the hardw ar and their components when fully functional must be quantified. This computer hardware components include the Uninterruptable Power Supplies (UPS), the Information Technology Equipment, ignitor and people working in the selective information center building. As it had been stated earlier, some of the hardware equipment to be used in the data center are NetApp 2050, HP C7000 brand name enclosure, and KVM. Each of this equipment has different borderline ventilation requirements. To install HP C7000 Blade enclosure, thither are several minimum requirements. For good capability of HP C7000 Blade enclosure, there are different rack requirements. According to HP C7000 Blade enclosure documentation (Hew lett-Packard Development Company, 2010), HP C7000 Blade enclosure is optimized to work with 10000 series racks. Thus to hasten adequate airflow and to stop for servicing, the spatial requirements below are considered. A clearance of nearly 0.635 meters is left(a) at the straw man stir up of the rackAt the back, a clearance of 0.762 meters is left to facilitate In case of multiple racks, approximately 1.219 meters is left between the back of one rack and the rear of the adjacent racks. The design of HP C7000 Blade enclosure is in such a way that cool air is drawn into the system from the front part to cool the system.... Room ventilation The data center is composed of servers, routers, switches, among other hardware. All this are electronic devices which produces heat. This heat if not well eliminated, can destroy the electronic components in the hardware contained in the data center. Air cooled systems are mostly used in data centers since most of the equipment are air coole d. In this project, considering the number of hardware used and the software run on the systems, an air cooled system allow be efficient. Before designing the air cooled system, the amount of heat produced must be quantified. This is either in calories, joules, Tons or BTU. To determine the heat output of the system, the total quantity of heat produced by the hardware and their components when fully functional must be quantified. This hardware components include the Uninterruptable Power Supplies (UPS), the Information Technology Equipment, lighting and people working in the data center building. As it had been stated earlier, some of the hardware equipment to be used in the data center are NetApp 2050, HP C7000 Blade enclosure, and KVM. Each of this equipment has different minimum ventilation requirements. To install HP C7000 Blade enclosure, there are several minimum requirements. For good efficiency of HP C7000 Blade enclosure, there are different rack requirements. According to HP C7000 Blade enclosure documentation (Hewlett-Packard Development Company, 2010), HP C7000 Blade enclosure is optimized to work with 10000 series racks. Thus to facilitate adequate airflow and to allow for servicing, the spatial requirements below are considered. A clearance of approximately 0.635 meters is left at the front part of the rack At the back, a clearance of 0.762 meters is left to facilitate
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment